Floor screed calculator online

Calculate floor screed online. Enter the required dimensions and parameters to estimate quantities and key values.

DOC_REF // CALC-FLOOR-SCREED

Wall area

Layer thickness

Material

Diagram room
LWH

Input mode
Mode thickness
Material
screed Type

Floor area0 m²
Elevation difference0 mm
Calculation Thickness0 mm
screed Volume0 m³
Dry Mix Mass0 kg
Bags0 pcs

Results are estimates. Check the dimensions and verify the design against local requirements before construction.

01 / Calculation method

Floor screed estimate

The floor screed calculator estimates room area, average layer thickness, screed volume, and approximate material use. It supports bagged dry mix, cement-sand proportions, and ready-mixed mortar ordered by cubic meter.

Results are approximate. Before purchasing, check the mix data sheet, actual base levelness, project requirements, and manufacturer recommendations.

Floor area

If room dimensions are entered, area is length times width:

A=L⋅WA = L \cdot W

where AA is floor area in m², LL is room length in meters, and WW is room width in meters. If area is already known from a measurement or plan, enter it directly.

Average screed thickness

For a simple calculation, enter average thickness HH in millimeters, not the minimum thickness at the slab’s high point. Screed is leveled to a horizontal datum, so the depth varies across an uneven base; for example, it could be 30 mm at a high point and 60 mm at a low point.

To find the average, mark a horizontal line with a laser level, measure the distance to the base at 4–5 points, and calculate the mean. This better represents actual mortar volume.

For a noticeably sloped base, use four-corner mode. The calculator finds the average:

Havg=HA+HB+HC+HD4H_{avg} = \frac{H_A + H_B + H_C + H_D}{4}

It also shows elevation difference:

ΔH=Hmax−Hmin\Delta H = H_{max} - H_{min}

This indicates base unevenness, while volume is calculated from average layer thickness.

Screed volume

Volume is based on area and average thickness. Since thickness is in millimeters, divide by 1000 to convert it to meters:

V=A⋅Havg1000V = \frac{A \cdot H_{avg}}{1000}

where VV is screed volume in m³. Each 1 mm layer over 1 m² is 0.001 m³, so volume scales directly with area and thickness.

Dry mix consumption

For bagged dry mix, use the manufacturer’s consumption per 1 m² for a 1 mm layer. The screed type selects a typical baseline: wet cement-sand screed usually consumes 1.8–2.0 kg/m²/mm, semi-dry screed about 1.5–1.7 kg/m²/mm. Use the separate self-leveling floor calculator for thin finishing mixes. Actual consumption depends on the product, so use the bag or data sheet for purchasing.

M=A⋅Havg⋅qM = A \cdot H_{avg} \cdot q

where MM is mix mass in kg and qq is consumption in kg/m²/mm. Bag count is rounded up:

N=⌈Mmbag⌉N = \left\lceil \frac{M}{m_{bag}} \right\rceil

If the manufacturer gives consumption per 10 mm, divide by 10. For example, 18 kg/m² per 10 mm equals q=1.8q = 1.8 kg/m²/mm.

Cement and sand

For a cement-sand mix, the calculator splits total volume by the selected ratio. For a ratio c:sc:s, the total number of parts is:

k=c+sk = c + s

Cement and sand volumes are:

Vc=V⋅ckV_c = V \cdot \frac{c}{k} Vs=V⋅skV_s = V \cdot \frac{s}{k}

Approximate bulk densities convert volume to mass: 1400 kg/m³ for cement and 1600 kg/m³ for sand.

Mc=Vc⋅1400M_c = V_c \cdot 1400 Ms=Vs⋅1600M_s = V_s \cdot 1600

Cement is also converted to bags of the selected size, 50 kg by default:

Nc=⌈Mcmbag,c⌉N_c = \left\lceil \frac{M_c}{m_{bag,c}} \right\rceil

Approximate water demand is based on the water-cement ratio:

W=Mc⋅rwcW = M_c \cdot r_{wc}

where WW is water in liters and rwcr_{wc} is the selected water-to-cement ratio. A preliminary cement-sand screed estimate often uses 0.45–0.55, but adjust actual water for sand moisture and required consistency.

If fiber is enabled, its mass is based on screed volume and dosage in grams per 1 m³:

F=V⋅dfF = V \cdot d_f

Semi-dry or reinforced screed often uses 600–900 g/m³; check the fiber manufacturer’s instructions for the exact dosage.

This model is useful for purchasing estimates, but actual consumption can vary with sand moisture, compaction, losses, and mixing method.

Ready-mixed mortar and allowance

In ready-mix mode, the calculator reports the estimated volume in m³. Add 5–10% for an uneven base, guide rails, underfloor heating, difficult delivery, or process losses.

For cement-sand screed, the allowance is needed for both placement losses and shrinkage. Cement paste fills the voids between sand grains, and the mortar physically shrinks as it dries. For purchasing, multiply the calculated volume by about 1.05–1.10:

Vbuy=V⋅ksV_{buy} = V \cdot k_s

where ksk_s is the allowance and shrinkage factor. Buying exactly the calculated amount can leave too little cement, sand, or ready mix near the end of the work.

Screed weight and floor loading

A typical cement-sand screed creates a significant permanent load. At a density near 2000 kg/m³, a 50 mm layer weighs about 100 kg per square meter:

G=ρ⋅H1000G = \rho \cdot \frac{H}{1000}

Check this load separately for older buildings, timber floors, and worn slabs. Lightweight screeds with expanded clay, polystyrene granules, or other lightweight floor systems may be considered where weight is critical.

Reference standards for screed work include EN 13318 for terms, EN 13813 for screed materials, and EN 1264 for water-based underfloor heating systems. This calculator estimates materials; it does not check the floor structure against design standards.

02 / Frequently asked questions

Why is screed volume based on average thickness?

The calculator estimates material across the area using an equivalent average layer. Maximum thickness matters for construction and loading, but applying it to the entire room would overstate dry mix or mortar consumption.

When should I use the four-corner calculation?

Use four-corner mode when the base is sloped or the room corners have different elevations. The calculator finds average thickness and shows elevation difference separately to help estimate screed volume and base preparation.

Why enter average screed thickness instead of the minimum layer?

Screed is poured to a level datum, while the floor slab is almost always uneven. A high point may have a 30 mm layer and a low point 50–60 mm, so using the minimum thickness can leave you short of mix. Use a laser level to mark a horizontal plane, measure the base at 4–5 points, and average the results.

Why are bag quantities rounded up?

Dry mix is sold in whole bags. The calculator divides required mass by bag weight and rounds up so there is enough material for the entire layer.

What is the difference between dry mix and cement-sand calculations?

Dry mix uses the product’s consumption in kg/m²/mm. For cement and sand, the calculator first finds screed volume, divides it according to the selected mix ratio, and converts component volumes to mass using approximate bulk densities.

Why select a screed type?

Wet cement-sand screed and semi-dry screed have different density and consumption. A 10 mm layer of wet mix typically uses about 18–20 kg/m², while semi-dry mix uses 15–17 kg/m². The calculator applies typical values; check the bag for a precise purchase estimate.

When should I calculate a self-leveling floor instead?

For a thin finishing layer of about 20–30 mm or less, use the self-leveling floor calculator. Traditional screed is better for base leveling and thicker layers. Self-leveling products use their rated kg/m²/mm consumption and need a separate check of minimum and maximum thickness.

Can I use this calculator for underfloor heating?

Yes, for a preliminary volume and material estimate. Minimum thickness above pipes or cable depends on the heating system, mix type, and manufacturer requirements, so verify those values separately.

Should I add an allowance for floor screed?

Yes. A 5–10% allowance is common for purchasing. It accounts for mixing and delivery losses, local base unevenness, guide rails, and small differences in actual thickness.

For cement-sand mortar, an allowance also accounts for shrinkage: cement fills the voids between sand grains, and the layer reduces slightly in volume as it dries. Avoid buying exactly the calculated amount.

How heavy is a cement-sand screed?

A typical 50 mm cement-sand screed weighs about 100 kg/m². This may be acceptable for a new concrete slab, but check loading separately for older buildings, timber joists, and worn slabs. If weight is critical, consider lightweight systems with expanded clay, polystyrene granules, or other light floor mixes.

How do I calculate cement, sand, water, and fiber for a homemade mix?

In “Cement and sand” mode, the calculator divides screed volume by the selected ratio, such as 1:3. It converts cement to kilograms and bags, shows sand in m³ and tonnes, and estimates water from the water-cement ratio. Fiber can be enabled separately; semi-dry or reinforced screeds often use 600–900 g per 1 m³ of mortar.